FIRST STAGE OF CK-11 DEPLOYMENT COMPLETED AT THE NOVY PORT FIELD, THE NORTHERNMOST OIL AND GAS CONDENSATE FIELD
(GAZPROMNEFT-YAMAL LLC)

Monitor Electric has completed the first stage of CK-11 deployment at the energy dispatching center of the Novoportovskoye field, the northernmost and one of the most technologically challenging oil and gas condensate fields in Russia.

Over the course of 2020–2022, despite the logistics difficulties caused by COVID-19 restrictions, the team of Monitor Electric JSC, together with co...

SEMINAR ON THE USE OF THE FELIX SIMULATOR FOR LENENERGO SPECIALISTS

In February 2023, the St. Petersburg office of Monitor Electric JSC hosted consultations for specialists of Rosseti Lenenergo PJSC on conducting emergency response drills using the CK11.Felix dispatcher training simulator, which enables modeling of various network configuration and operating scenarios on the CK-11 information model in real time.

Together with the customer's spe...

CK-11 ELECTRONIC LOGBOOKS PUT INTO COMMERCIAL OPERATION AT YUGO-ZAPADNAYA CHPP

In January 2023, the deployment of a CK-11 platform software suite was completed, automating the maintenance of operational logbooks and other technological documentation at the Yugo-Zapadnaya CHPP in St. Petersburg. The automated system runs on the Russian Astra Linux OS platform and the PostgreSQL DBMS.

As part of the project, the electronic operational logbook «YoZh-2», which ha...

CK-11 AT YEKATERINBURG ELECTRIC GRID COMPANY MIGRATED TO A DOMESTIC SYSTEM PLATFORM

Yekaterinburg Electric Grid Company is one of the oldest CK-11 deployment sites. The company's automated process control system (ASTU) utilizes a large number of CK-11 functions and components, has accumulated significant volumes of information, and has more than 400 registered users.

In November 2022, Monitor Electric specialists completed the migration of the Yekateri...

V INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE «MODERN CHALLENGES OF POWER INDUSTRY AUTOMATION»

On September 14–15, 2022, Moscow hosted the 5th International Scientific and Technical Conference «Modern Challenges of Power Industry Automation», organized by VTI OJSC.

The event was attended by more than 30 organizations operating in the thermal power industry, including generating companies, software developers, and equipment manufacturers.

The conference featured ...

GRID CONTROL CENTER OF THE PRIMORSKY ELECTRIC NETWORKS BRANCH OF DRSC JSC BUILT ON CK-11

On September 6, during a working visit to Primorsky Krai, Minister of Energy Nikolai Shulginov and Chairman of the Management Board of SO UPS JSC Fedor Opadchiy visited the Grid Control Center (GCC) of the Primorsky Electric Networks (PES) branch of the Far Eastern Distribution Grid Company, which has been in operation since September 2021 and runs on the modern domestic CK-11 s...

DEPLOYMENT OF OPERATIONAL DOCUMENTATION AUTOMATION TOOLS ON THE CK-11 PLATFORM AT UNIPRO PJSC BRANCHES

In June 2022, Monitor Electric completed the automation of operational documentation management on the CK-11 platform at all power plants of Unipro PJSC.

The transition of operational documentation at Unipro PJSC power plants to electronic form began in 2019. A digital information model of the plants' electrical and thermal equipment was created, an electronic operational logbo...

CK-11 DEPLOYMENT PROJECT COMPLETED AT THE ROSSETI LENENERGO TRAINING COMPLEX

In June 2022, the CK-11 software deployment project was successfully completed at the Training Complex of Rosseti Lenenergo PJSC, which is designed for training, retraining, and professional development of electric power industry personnel.

CK-11 platform software was installed and configured on the Training Complex's own infrastructure, running on the domestic Astra Linux oper...

GRID CONTROL CENTER IN SHUSHA AT AZERISHIG OJSC BUILT ON CK-11

On May 10, with the participation of President of the Republic of Azerbaijan Ilham Aliyev and Chairman of Azerishig OJSC Vugar Ahmadov, the inauguration of the digital grid control center in the city of Shusha took place.

Based on the new server infrastructure and modern workplaces for operational personnel, Monitor Electric JSC carried out a full scope of work on the installation ...

THE INTERNATIONAL ELECTRIC NETWORKS FORUM 2022 EXHIBITION

In March 2022, after a two-year break, Russia's largest International Electric Networks Forum was held. Monitor Electric presented new and promising developments, including import substitution solutions for automated control systems of power systems, electric networks, and power supply systems.

The key element of the Monitor Electric exhibition stand was a prototype of the CK-2...

INTERNATIONAL CONFERENCE ON THE DEVELOPMENT AND APPLICATION OF COMMON INFORMATION MODEL STANDARDS «CIMC 2022»

On March 17–18, Minsk hosted the international conference on the development and application of Common Information Model standards «CIMC 2022». Monitor Electric was one of the three organizers of the conference, together with its Belarusian partners, Energopromis and InnoTech Solutions.

The event was dedicated to the release of the Belenergo GPO enterprise standard «Definition of a...

FIRST STAGE OF CK-11 DEPLOYMENT COMPLETED AT TULENERGO

At the end of November, Monitor Electric completed the first stage of CK-11 deployment at the Unified Grid Control Center (UGCC) of Tulenergo.

During 2020, Tulenergo employees independently built a digital information model of the electric network in CK-11 with remote support from Monitor Electric engineers. The network information model comprises more than 12,000 transform...