Experts from Monitor Electric will speak at the Sixth International Scientific and Technical Conference «CIM in Russia and the World – 2026,» to be held on 5–6 February in Sochi. Specialists will present proposed solutions for information exchange, standardisation of data model descriptions, and successful migration cases to CIM.
Head of Generation Projects Department Anast...
At one of the distribution grid districts of Rosseti Lenenergo PJSC, pilot operation of the AutoFLISR application has been completed. The service underwent testing in real-world conditions for over a year and has now been transitioned to full-scale industrial operation.
In the event of power grid equipment tripping due to relay protection operation, AutoFLISR autonomously i...
System settings have been added to the CK.Outage Requests system to optimise request cancellation and approval processes. The request approval mechanism when working with external systems has been improved: account is now taken of future approval information when generating a dynamic route for a request received from an external system. A similar option has been implemented for request t...
A new «Statistics» tool enables analysis of the duration of various equipment repair types based on approved requests for a selected period. The analysis breaks down by work type in convenient units of measurement (hours or days). Any period and equipment composition can be selected.
The new tool also allows visibility into the duration of equipment in operation for future ...
Support for polling ESM devices has been added to the CK.Advanced Metering HES energy resource metering subsystem. Functions for collecting current readings, archive readings (as of the beginning of the day), power profiles, and instantaneous values of electrical parameters are now available.
The ESM device combines a three-phase multi-tariff commercial electricity meter, a...
GeoMAG, an application for viewing the location of power facilities on a geographic map and monitoring their status, now includes visualisation of consumer complaints regarding power supply interruptions. Even if a consumer is not present in the CK-11 information model, a call centre operator can place a special marker on the relevant network section displayed on the map. As soon as power suppl...
The application of modern technologies in the management of distribution electrical networks was discussed by employees from four companies: Rosseti Centre, Rosseti Lenenergo, Rosseti Ural, and Rosseti Moscow Region. The seminar, held at Monitor Electric's head office in Pyatigorsk, was attended by representatives of dispatch personnel, IT systems and communications development departments,...
Monitor Electric is participating in the International Forum Electric Networks 2025, taking place in Moscow on 2–4 December. At our booth, you can join live demonstrations of SCADA/EMS/ADMS/DTS software suites, as well as explore our innovative developments:
- Automation of switching in distribution networks, probabilistic analysis for fault location determination, automated input ...
A mechanism has been integrated into the equipment outage request management system that requires specifying the reason for rejection at the approval and endorsement stages. The system administrator now has the ability to activate an option whereby the «Reject» button becomes unavailable until a text field with the reason for rejection is filled in.
The function is disabled by defa...
The task of ensuring data exchange between various software systems and counterparties faces most of our clients and requires bringing the model into compliance with industry standards. The application of standardised information exchange between systems ensures independence from the manufacturers of the systems in operation.
To address this task, in the latest CK-11 update we have...
In the latest update of the CK.Logbooks product, a mechanism for automated preparation and verification of work permits for compliance with high-risk operations regulations has been implemented.
Previously, the responsible executor was forced to manually enter a large volume of data and independently formulate safety measure instructions, which created risks of inaccuracies and omi...
The Control Measurements application, part of CK-11, has been enhanced with algorithms for automatic calculation of key parameters in the generated summary sheet. Based on the obtained primary values, the algorithm now automatically determines the values of recorded imbalances. For cells with transformers, automatic calculation of values at the terminals is provided, taking into account network...