News
TABLE VIEW OF BALANCING MARKET SCHEDULES IN PLANNED SCHEDULE MONITORING

The Planned Schedule Monitoring application, part of the MODES-Centre SE suite, has been enhanced with a table view of balancing market schedules (BMS) in addition to the graphical display. This improvement allows users to view all values for the selected period simultaneously, significantly facilitating information analysis.

Additionally, information on the validity period...

INDICATION OF CHANGES IN THE REPAIR SCHEDULE

The repair card now features an indication of changes made relative to the original data. This improvement is primarily intended for specialists involved in reconciling repair schedules, helping to draw their attention to modifications.

The new indication facilitates the consideration of changes when planning work schedules and enables faster assessment of the correctness of work d...

CK-11 MADE A GREAT IMPRESSION ON ENERGY SPECIALISTS FROM THE REPUBLIC OF MALI AT A GRID COMPANY

A delegation from the Republic of Mali, led by Minister of Energy and Sanitation Tiémoko Traoré, visited the Network Control Centre and training facility of JSC «Grid Company» (Tatarstan). The guests were introduced to the successful experience of organising operational and technological management based on the CK-11 software suite.

Representatives of the Grid Company demon...

EARLY WARNING OF REPAIR DURATION EXCEEDANCE RISK

An indication has been added to the CK.Outage Requests system interface to alert users about the risk of exceeding repair work durations when the duration is longer than a specified threshold (45 days by default). The timing of the alert can be configured in a few clicks within the system settings.

This improvement applies to «Urgent» and «Emergency» request categories. Tha...

SPECIALISED COURSES FOR CLIENTS AND PARTNERS

The Monitor Electric Training Centre held specialised in-person courses in Pyatigorsk, dedicated to studying the features, developing administration and operation skills for the CK-11 system and other software products. The courses were attended by representatives of ZapSibNeftekhim, Kamchatskenergo, IEC «Energy Efficient Technologies,» NefteKhimProekt association, Rosseti Tsifra, and Unitel En...

MANAGEMENT OF CONTRACTOR PERSONNEL PERMISSIONS AT POWER FACILITIES

A new application, Personnel Permissions, has been introduced as part of the CK.Logbooks product suite. It enables the description of employee permissions, including their validity periods and applicable objects, independently of the information model.

Integration with other electronic logbooks on the CK-11 platform has been established. In particular, the current employee list in ...

MONITOR ELECTRIC AND SBER'S "SCHOOL 21" TO LAUNCH JOINT IT SPECIALIST TRAINING

Graduates of the Stavropol campus of Sber's digital technology school «School 21» will have the opportunity to intern at Monitor Electric with the prospect of employment and to participate in joint events with key employees of the IT company.

The parties have signed a three-year cooperation agreement, which includes plans for joint masterclasses, conferences, and other events.<...

OPERATIONAL LOG MAINTENANCE WHEN WORKING WITH SWITCHING FORMS

As is well known, the use of the electronic Operational Log together with other CK-11 applications for operational and technological management of electrical networks enables automatic entry of approximately 80% of records into the log. In the upcoming version of CK-11 (version 7.1.30, scheduled for release in summer 2026), new scenarios for automated record entry into the Operation...

DAILY SUMMARY TABLE IN THE TVO REPORT

The «Temporary Load Shedding Schedule» report, which can be generated in the CK-11 Control Measurements application, now includes a summary daily tab. The new report tab supplements the hourly outage data, allowing comparison of actual hourly measurements with the approved temporary load shedding schedule values.

The summary table reflects actual hourly load indicators, planned val...

ENHANCED CAPABILITIES FOR RELAY PROTECTION SETTING CALCULATIONS

Personnel of relay protection and automation services can now perform calculations of differential current protection and distance protection settings in CK-11, implemented on the basis of EKRA microprocessor terminals. This functionality is available in the TNA setting calculation module.

Results can now be saved within the project and in a tabular report, with the ability to tran...

ENHANCED RESILIENCE OF CK-11 DOMAINS TO NETWORK DISRUPTIONS

Resilience is ensured through the application of new algorithms for determining the role of a CK-11 domain in a multi-domain configuration.

If a CK-11 domain loses connectivity with another domain in an MDS (inter-domain synchronisation) session, upon supervisor restart, it will assign itself the same role that other supervisors in the same domain have previously assigned t...

SAFE EXECUTION OF REMOTE CONTROL COMMANDS

Remote control of switching devices is the most critical function of SCADA. To make this operation more secure, we have implemented and already successfully tested at a number of sites a specialised Remote Control Security System (RCSS) for protected transmission of remote control commands, designed to ensure the required level of information security when authorising and transmitting r...


Для корректной работы сайта поверните устройство вертикально