The task of ensuring data exchange between various software systems and counterparties faces most of our clients and requires bringing the model into compliance with industry standards. The application of standardised information exchange between systems ensures independence from the manufacturers of the systems in operation.
To address this task, in the latest CK-11 update we have...
In the latest update of the CK.Logbooks product, a mechanism for automated preparation and verification of work permits for compliance with high-risk operations regulations has been implemented.
Previously, the responsible executor was forced to manually enter a large volume of data and independently formulate safety measure instructions, which created risks of inaccuracies and omi...
The Control Measurements application, part of CK-11, has been enhanced with algorithms for automatic calculation of key parameters in the generated summary sheet. Based on the obtained primary values, the algorithm now automatically determines the values of recorded imbalances. For cells with transformers, automatic calculation of values at the terminals is provided, taking into account network...
Monitor Electric specialists have increased the number of events recorded in the audit subsystem of the CK-11 platform, which is designed to generate a record of all user session actions. This solution is aimed at information security services and system administrators, where requirements for accounting and access control to operational management systems are regulated by industry standards.
The CK.Outage Requests software product now features the ability to control consumer notifications regarding upcoming outages. This new functionality provides grid company personnel with an additional tool for operational control of regulatory compliance, helping to reduce the enterprise's reputational and commercial risks.
The approval and execution of requests for work in ele...
A mechanism for configuring time‑based technological processes has been introduced into the CK.Advanced Metering HES system for accounting of various resource types, enabling the breakdown of energy consumption by production operations. This improvement allows the chief power engineer's service and planning and economic departments to maintain reliability, reduce operational costs, and enha...
Resolving a complex defect often requires the involvement of multiple departments, such as the relay protection and automation service and repair teams. In such situations, each department records only its own portion of the work as a separate entry in the corresponding log. The absence of a single point of control often results in the dispatcher or responsible engineer lacking an operational o...
Monitor Electric specialists have implemented a comprehensive set of updates for working with Temporary Load Shedding Schedules (TLSS), aimed at reducing dispatcher time expenditure during schedule entry, minimising the risk of errors, and increasing interaction efficiency with the system.
TLSS entry is one of the critical operations in power system management, requiring hi...
The absence of request receipt confirmation and an up-to-date processing status had a destabilising effect on the work of personnel responsible for work execution. In conditions of insufficient transparency for data synchronisation, employees were forced to duplicate requests through informal communication channels, which violated document flow regulations. Manual transfer of intervals from the...
The structure of unified power systems requires dispatch centres to maintain the highest level of synchronisation in generating source data for calculations. Verification of control measurements, historically tied to a single hour, created «blind spots» when analysing the dynamics of key parameters such as inter-system power flows or voltage levels at balance ownership boundaries. This limitati...
The process of preparing energy consumption reports has long remained a bottleneck in the work of enterprise analytical services. The need for manual export of data arrays with subsequent processing in third-party applications created a significant operational burden. This approach not only increased the time required for closing reporting periods but also served as a source of systematic error...
Monitor Electric specialists are working on improving algorithms for the automatic generation of text for workplace preparation measures in electrical installations. The change will affect persons responsible for issuing work permits and is aimed at eliminating situations of ambiguous interpretation of instructions.
Work performed in the electrical network, such as isolating sectio...