News
Compatibility of the СК-11 Platform with the «AMT InfoDiode» Suite Confirmed

In May 2024, specialists of Monitor Electric JSC and AMT-GROUP JSC completed testing of unidirectional telemetry data transfer tools between СК-11 via the «AMT InfoDiode» suite (AMT-GROUP JSC), which ensures physical segregation of network segments with different trust levels while preserving the required functionality for interoperability with adjacent information systems.

...

IX International Forum «Seymartec Energy. Power Supply and Energy Efficiency in Mining, Metallurgy, Mechanical Engineering, Power Generation, and the Oil & Gas Industry – 2024»

From March 19 to 21, a delegation from Monitor Electric JSC took part in the IX International Forum «Seymartec Energy. Power Supply and Energy Efficiency in Mining, Metallurgy, Mechanical Engineering, Power Generation, and the Oil & Gas Industry – 2024» in Chelyabinsk.

The business program was attended by over 300 representatives of major industrial companies from Russia and abroad...

IV INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE «CIM IN RUSSIA AND THE WORLD – 2024»

On February 8–9, a delegation from Monitor Electric took part in the fourth annual International Scientific and Technical Conference «CIM in Russia and the World – 2024.» The event, organized by SO UES JSC with the support of the Ministry of Energy of the Russian Federation, brought together about 200 professionals from major energy companies, research institutes, software and IT solution vendo...

DEPLOYMENT OF CK-11 AT GAZPROMNEFT-KHANTOS LLC AND THE GRID CONTROL CENTER OF GAZPROMNEFT ENERGY SYSTEMS LLC

The deployment of CK-11 at the energy dispatching center of Gazpromneft-Khantos LLC has been completed, with integration into the unified Grid Control Center (CUES) of Gazpromneft Energy Systems LLC, which was opened in Tyumen in 2022.

During the project, the team of Monitor Electric JSC, together with contractors and employees of Gazprom Neft Group, successfully deployed a...

FIRST STAGE OF CK-11 DEPLOYMENT COMPLETED AT MESSOYAKHANEFTEGAZ JSC

In 2023, the first stage of deployment of CK-11 platform software was completed at the energy dispatching center of the Messoyakha group of fields, located 250 kilometers from the Arctic Circle in the Arctic climate zone.

Over the course of three years, despite the logistics challenges caused by the pandemic, the team of Monitor Electric JSC, together with contractors and employees...

TESTING OF SOFTWARE FOR EXCHANGING EQUIPMENT OUTAGE REQUESTS WITH SO UPS JSC COMPLETED

On December 20, 2023, the CK.Outage Requests software, the request management system, successfully passed testing for the exchange of equipment outage requests between the Smolensk NPP branch of Rosenergoatom Concern JSC and the Central ODU branch of SO UPS JSC.

CK.Outage Requests is a software product that fully automates the business processes of managing requests for taking plan...

DEPLOYMENT OF ELECTRONIC LOGBOOKS AT EUROCHIM NORTH-WEST AND PHOSPHORIT

In December 2023, automated operational documentation systems running on the CK-11 platform were successfully put into commercial operation at Phosphorit Industrial Group LLC and EuroChem North-West JSC, both located within the Phosphorit industrial zone in the Kingisepp District of Leningrad Oblast.

The automation of operational documentation management required adapting the CK-11...

COMPATIBILITY OF THE CK-11 PLATFORM WITH THE RUSSIAN POSTGRES PRO DATABASE CONFIRMED

In December 2023, specialists from Monitor Electric and Postgres Professional conducted joint load testing of the current (16th) version of the Postgres Pro Standard database management system when used with CK-11, the domestic platform for building automated dispatch, process, situational, and commercial management systems for electric power facilities. During the testing, a specialize...

V ANNUAL ENTERPRISE AGILE RUSSIA CONFERENCE ON ACCELERATING BUSINESS AGILITY OF LARGE COMPANIES

On November 17, 2023, Moscow hosted the 5th annual Enterprise Agile Russia conference dedicated to accelerating business agility of large companies. The conference brings together and showcases successful Agile transformation cases from large organizations across various industries in Russia and abroad, featuring widely adopted Enterprise Agility frameworks such as SAFe®, LeSS, OKR, Nexus, and ...

RUSSIAN AND KAZAKHSTANI SYSTEM OPERATORS CONDUCT JOINT EMERGENCY RESPONSE DRILL

Moscow hosted an international cross-system emergency response drill for dispatchers of the Main Dispatch Center of the UES of Russia, the Siberian ODU and Urals ODU branches, and KEGOC (Republic of Kazakhstan) at the System Operator's Personnel Training Center. The drill was conducted using the Filin digital regime simulator, which modeled power system conditions as close to real values as pos...

ENGINEERING CONFERENCE DEDICATED TO THE 20TH ANNIVERSARY OF MONITOR ELECTRIC JSC

As part of the events celebrating the company's 20th anniversary, an engineering conference was held on September 14 at the Monitor Electric head office. The event was attended by representatives of the System Operator, STC UES, BESK, ODU South, Rosseti Volga, Rosseti Lenenergo, Rosseti Moscow Region, Rosseti Urals, Rosseti Center, Rosseti Center and Volga Region, Grid Company (Kazan...

SPARTAKIAD 20+

In June and September 2023, as part of the events celebrating the 20th anniversary of Monitor Electric, our company held a spartakiad in Pyatigorsk, bringing together more than 100 athletes from ODU South, MES South, Stavropolenergo, and, of course, Monitor Electric.

In the mini-football tournament, the MES South team claimed victory, the Stavropolenergo team took silver, and the M...


Для корректной работы сайта поверните устройство вертикально